project summary
Outdoor Living Area
This project involved the design and construction of a large, covered deck area for an outdoor living space in Northampton. The client approached us as a recommended builder, looking for a specialist in outdoor living spaces. The brief was to create a covered deck area that would house a hot tub and sauna. The client was keen that the new living space should not only look great but also stand the test of time.
To achieve this, we used high-quality materials throughout, including cedar and hardwoods. The client also specified that the hot tub and sauna should be usable all year round, in any season and in all weathers. To achieve this, we incorporated a heating system and weatherproofing measures to ensure that the space could be used comfortably in any conditions.
For the sauna, we added a special touch by including fibre optic lighting in the ceiling and innovative colour-changing LED lighting beneath the benches. We used thermo Aspen wood for the internal walls and benches and limestone for the flooring. Behind the heater, we fitted split-faced granite tiling and an integrated speaker system for a more enjoyable experience.
When it came to the hot tub, we set the hot tub on a concrete base, level with the decking and used solid oak posts to support the roof. The steps and planters were made from hardwood. For the ceiling, we used color-changing LED lighting along with LED spotlighting. We also installed integrated ceiling speakers.
Overall, this project was a success in that it exceeded the client’s expectations by creating an outdoor living space that is both beautiful and functional, with added customizations for a more personalized and enjoyable experience. The use of high-quality materials, such as cedar, hardwoods, limestone, granite, and thermo Aspen wood and the incorporation of modern amenities, such as acoustic insulation, heating systems, LED lighting, and integrated speakers, ensures that this space will be enjoyed for many years to come.
Project
Duration
6 weeks
Project
Location
Northampton
Project
Completion
May 2018